Case Studies
Read about our latest land drainage, groundworks and construction projects completed in Central Scotland.
Farm Pond Construction
3 years ago | Jamie Dick
The design and construction of a new pond on a farm site in Thornhill, near Stirling - undertaken in May 2020.
Twinwall Leader Pipe
3 years ago | Jamie Dick
The installation of a new 300ml twin wall pipe adjacent to the A91, for Stirling Council in March 2020.
Field Flood
3 years ago | Jamie Dick
Partially renewing an existing drainage system on a farm based at Gorebridge, in 2018.
Water Under the Bridge
3 years ago | Jamie Dick
Installation of a 150mm twin wall leader drain under a viaduct of the main railway line between Edinburgh and Glasgow, in 2019.
Deep Leader Drain
3 years ago | Jamie Dick
The installation of a new 150ml coil pipe into a low-lying field. Thereafter a new drainage system was installed, near Clackmannan, Stirlingshire.
New Field Scheme
3 years ago | Jamie Dick
The design and installation of a completely new drainage system, on the Carse of Stirling, in 2018.
Equestrian Menage Construction
3 years ago | Jamie Dick
The design, installation and construction of a new manage on a homestead near Blackness, in 2016.
Construction Site Deep Drain
4 years ago | Jamie Dick
On the site of a newly formed respite home, installing a 150ml twin wall pipe at a depth of 3 metres as the main outlet for all drainage – taken in 2020.